Friday, May 29, 2009
Chocks and Tanks
Silent Maid was being painted, spars varnished, chocks for the rig, hardware and brass blocks arrived, the engine pulled to place the drip pan. Cabin beams are in, hatched framed, Phil was working on the gaff jaws.. The interior is growing smaller everyday.
Spartina got her air tanks epoxied and the cuddy sole reinforced.
A 20 year old sharpie returned to the seaport. Isobel is green and white and sank slowly as she takes up in the boat basin.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment