Thursday, November 12, 2009

Philadelphia Again

Tuesday on the trailer, Thursday off the trailer. Many hands make the heavy work fun, still heavy. It is a good thing that the boatshop practices good karma and people want to come help. SILENT MAID arrives on her trailer, She is lifted with the two gantry cranes and lowered and blocked onto the three BIG dollies. She is winched and prodded into the shop by willing hands, electric winch and snatch block and a good old fashioned block and tackle. Boat yoga is practiced by all hands. Today is a lesson on how to move heavy stuff carefully. After she is in the shop, poppets hold her steady and all her ports, lockers and deck holes are opened for drying out. There is a huge amount of boat stuff. I make piles of like items: like lines, galley gear, bunting, safety stuff, PFDs and throwables, pillows, bunk cushions, and Mr. K's stuff. The boat costumes are segregated and placed in a hanging locker to keep the silk nice. The shop seems pretty full when we roll the other boats back in, but next week TORCH will be here too.
http://www.facebook.com/photo.php?pid=4207236&id=125811239464&saved

There is a book about Silent Maid that was published in 1903. I wonder if it was about a mermaid.











Tuesday, November 10, 2009

Silent Maid Leaves the Creek.




Henry, John, and Jeff (and me a little before I had to leave for school) commenced down rigging the mast so MAID could be blocked on her trailer for the trip back to the shop.

Monday, November 9, 2009

Tuckup Party One




Down on the farm, we used to say, "One boy was a boy, two boys were half a boy." I'm glad guys grow up because tonight the raw talent was amazing. So much got done in this one evening I will have to get a longer list for next time. Oak got cut for the missing frame, a mold was made to pre-bend it, the scuff was scarfed, rub rails were roughed out and a split was patched. Way to go guys. Thanks, Ed, Paul, Carl, Ned, Pete and Mike!


Sunday, November 8, 2009

Boatbuilder Extraordinaire

Friday, October 30, 2009

John Brady, Boatbuilder

at 70.8%

Nice interview by Tom Armstrong. In fact, he puts up a lot of really interesting stuff here. These photos are from his blog.


I like the Ghost ships and the working boats.


I also hold Shadboats near and dear to my soul. I would really like to build/rebuild one. Maybe in glued lap ply. Such a lovely shape.

Mudding



Paid rent today, taping joints in the new lab. Scraped more varnish off URCHIN. Should have been out rowing. It was a beautiful day.

Saturday, November 7, 2009

Twos a Crowd





Been working on SPARTINA sanding, scraping and Fairing. Brought URCHIN over for the varnish I was going to do before going to MD. That time was taken up repairing trailer lights. Scraped URCHINs starboard gunwale.
Cleaned the studio, mowed, leaf raked, stacked firewood, moved plants to the lab. tired.




There is something very comforting about seeing your winter heat stacked next to your front door. I make the stove wood pile about four feet high; that's shoulder height for me. Then I start the second pile in front and use that as a step stool to finish the first stack. I go as high as I can reach. Pete will finish off the top, while I start the next pile on the other side of the porch. We fit about a cord and a half on the porch. This is my pile. I can snag a piece on my way in after work or run out for a piece barefoot in jammies. Pete will make a big pile in back for the rest. He will put on boots and gloves for his pile.

Monday, November 2, 2009

The Elves were at Work Whilst We Were Away



The TOP PRIORITY awaiting sanding.









Nice butt joint on the sharpie. Caulked with cotton and primed while we were away at the Sultana Downrigging.

Bamboo Spars



This plastic canoe was retro fitted with bambbo spars, polypropylene and twine lines, duct tape and tarp sails and primative lee boards. It has a certain cachet.

Happy Halloween


Jack, the Pirate Pumpkin. He appeared on our deck complete with candles.

Fall Preparations


The Sneakbox on her trailer and the Railbird Skiff out for the winter. They are headed back to the warehouse.

Monday, October 26, 2009

So Sad Summer is Over





Took in the canvas, bailed the boats, pulled the sneakbox and the railbird for winter dry storage. Pulled the masts from the Garvey. Taking the wedges from the sneakbox.

Sunday, October 25, 2009

Look Mom, I Can See Myself


Well, at least that what I am trying for. Sanding and scraping lead to lots of reflective thinking. Hours by yourself doing repetitive motions. Sometimes I sing real loud with the radio, mostly though I replay videos in my head and time travel.

2nd Day of Trailer Fixing


What is it about trailer lights? It seems like they work for only the first day you hook them up and may not even that long when someone clips you in the parking lot. The little gremlins (opposite of Brownies) get in there and break the wires inside the insulation, or burn out the bulbs, or corrode the fittings.
Lucky for me, this girl has a trailer light fixer who doesn't complain much. He gets his rewards.

Saturday, October 24, 2009

Hours Scraping

Spent most of today scraping green epoxy for that super high gloss. Prairie Home Companion was good company except for the cowboy stuff.

Friday, October 23, 2009

SeaSteading

Masses of ships parked because of world recession. There have been ships parked in the Delaware all summer. See 70.8% blog
Daily Mail - Anchored ships
ghost ship cities

Sanding and Epoxy




Sanded, still fairing.
Put a coat of low viscosity epoxy on SPARTINA today. It is cold, so the epoxy should level out better. I also used a slow kicker. Went home to warm up. My diploma came in the mail. It is huge, 320 square inches.

TOP PRIORITY



She is back in the shop. Most of her original parts are there. She has some 10year old masking tape to start sanding off. Got to see some great old photos of the construction. These three tuck-ups (TOP PRIORITY, TOFU, and ARTEMIS)were built by John Brady on the barge almost twenty-five years ago. TOFU became Marion Brewington which is now owned by the Del Val TSCA. The other two were supposed to be the Edwin Brownlee and ... Joeseph Leiner. ARTEMIS was never renamed since she went directly to her owner. She is in the ISM small boat collection now.
There are two rigs for this boat. A racing rig which will need a new mast and gaff, and a pleasure sprit rig. One year, an Ohio tuck-up won the constitution cup with a sprit rig because she was lighter, only carrying two crew members.

Friday, October 16, 2009

Smokestack




Silent Maid has a nice little diesel stove made by Wallace. It has a ceramic cook top when the lid is open and acts as a cabin heater when the lid is down. A squirrel cage blower forces air over the cook top to heat the air. I've used it to dry things out and it does warm the cabin well when the companionway hatches are closed.
John made a beautiful cover for the vent stack by gluing up a birdsmouth tube from 1/4" mahogany and giving it an "S" curve by clamping it to a scribed pattern before the epoxy kicked.

Sharpie Keel




Silent Maid left today in the remanents of a NorthEaster. She was towed, instead of sailed, by HURRICANE, her owners workboat.
See Henry in the Chesapeake on Silent Maid's FaceBook page.

I spent the morning making a keel plank for the sharpie. Charles rough cut and planed it yesterday. I measured and recut it and jointed the sides straight. Dave was trimming the centerboard slot yesterday with the router.
TSCA members are invited to come work on the ISM tuckup on Monday nights 5-8pm and some weekends starting with Oct. 26. Skip the first Monday in Nov. Then call me and let me know you are coming. I'll send out an email to TSCA members.