Saturday, February 11, 2012

W & W

Whaleboat only needs three more frames. Her outwales are fitted.


Two Whitehalls are being built by both volunteers and CHAD students. One will be carvel planked, and the other will be lapstrake. There will be an upside-down build and a right-side up build. The next two pix are the carvel molds set up.









The last pic shows the stem-keel-skeg assembly ready to brace to the ceiling for the lapstrake boat. These boats were lofted by Nick


1 comment:

Anonymous said...

10cric login - Gold Casino
To make dafabet a deposit at this 12bet site you need to click on the deposit section at the top right corner. This is a list of deposits that you can 10cric make at this site.