New images of an old friend. Learning the laser at NextFab.
Sunday, February 26, 2012
Wednesday, February 22, 2012
3D Scanner
Thursday, February 16, 2012
Saturday, February 11, 2012
W & W
Whaleboat only needs three more frames. Her outwales are fitted.
Two Whitehalls are being built by both volunteers and CHAD students. One will be carvel planked, and the other will be lapstrake. There will be an upside-down build and a right-side up build. The next two pix are the carvel molds set up.
The last pic shows the stem-keel-skeg assembly ready to brace to the ceiling for the lapstrake boat. These boats were lofted by Nick
Sunday, February 5, 2012
Thursday, February 2, 2012
To N Fro Photos
Scarph joint where new keel meets old
Peeling back the planking to get at the stem
New knee and rotten stem (black area on the vertical board)
from the inside looking out
Damaged planks removed. Found two ribs that are partially rotten.
fitting new oak keel, pix from port side view
refining line with batten
using awls to pick up measurements, old keel in background
marking and fitting new keel
Damage to planking., 1/4" of wood was preventing a breach in the hull
sawing
Installing new keel with bronze bolts. Thank you Fritz for all Photos and captions.
Subscribe to:
Posts (Atom)